This is the test plan and report for Throughput for Focused Light (System-level Science Verification Acceptance Test Campaign), an LSST milestone pertaining to the Project System Engineering and Commissioning.
This document is based on content automatically extracted from the Jira test database on . The most recent change to the document repository was on 2025-01-29.